Toilet Seat

  • Toilet Seat
  • Toilet Seat
  • Toilet Seat
  • Toilet Seat
Toilet Seat
  • Jinen/Jinjiekun
  • Xiamen City, China
  • 30 days
  • 50 Sets Per Month

1. We use Plastic material to make toilet seat.
2. Customer-designed LOGO patterns can be provided.
3. Color: can be customized
4. Customized appearance design: accepted
5.Service: OEM or ODM
6. Sample: Available
7. Sample fee: Buyers need to provide express fee
8. Sample delivery time: within 15 days
9. Payment method: 30% prepaid by T/T, the balance is paid before shipment
10. Production time: 20-45 days
11. Delivery port: Xiamen

Attention Plz:

Could U please offer the following information when you send us the mould inquiry?

a) product drawing or the sample photo with sizes.

b) mould steel you want to use.

c) runner system you want(cold or hot)


Number Information Answer
 1 Quota Customer should offer detail products picture or 3D design or samples.
 2 Get Order Communicate with customer for mould material,cavity,runner etc.
 3 Mold design software Ug,Proe,Solidwork,CAD
 4 Mold Material C55,P20,718,2316,H13,2738,S136
 5 Processing machine CNC,Elaboration,EDM,Drilling machine,Injection machine.
 6 Runner Hot runne,Cold Runner
 7 Mold Life 500000 shots to 3000000 shots.
 8 Cavity Single or Multi
 9 Delivery time Usually 45 days


Number Information Answer

 1 Quota Customer should offer detail products picture or 3D design or samples.

 2 Get Order Communicate with customer for mould material,cavity,runner etc.

 3 Mold design software Ug,Proe,Solidwork,CAD

 4 Mold Material C55,P20,718,2316,H13,2738,S136

 5 Processing machine CNC,Elaboration,EDM,Drilling machine,Injection machine.

 6 Runner Hot runne,Cold Runner

 7 Mold Life 500000 shots to 3000000 shots.

 8 Cavity Single or Multi

 9 Delivery time Usually 45 daysOur Service

1.Mould Material Q/C

a) mould steel checking (hardness,flaw detection)

b) mould spare parts checking (hardness,size)

2.Mould Making Process Q/C

a) design checking ( product design,mould design,mould)

b) mould size checking (according to drawing)

c) mould testing (check mould working,sample)


How to reach our company xiamen?

1.From  xiamen by bus 1 hour.

2.From Shanghai by train 8hours.

3.From Guangzhou by air 2 hours.


Welcome To Visit Our Company and Inquiry Us! Customer Demand is Our ongoing motivation!




Get the latest price? We'll respond as soon as possible(within 12 hours)

Privacy policy

close left right