Plastic Parts Industrial Injection Mould
- Jinen/Jinjiekun
- Xiamen City, China
- 30 days
- 50 Sets Per Month
1. We have our own tooling shop, equipped with advanced machines for plastic injection mould and the plastic injection products.
2. We also have their own injection shop, to run the mold test & mass production for customers.
3. We have more than 15years experience for plastic injection mould and plastic injection.
4. We have precision production equipment which reach the international advanced level and the experienced technician.
5. With more than 10 engineers, for mold design, programming, project managers, we are using CAD/CAE/CAM software to do the design, analysis & programming, to guarantee the satisfaction of customers.
Plastic Parts Industrial Injection Mould
Plastic Industrial Mould Description:
Product Description | plastic injection moulding |
Mould material | PS, ABS, PP, PVC, PMMA, PBT, PC, POM, PA66, PA6, PBT+GF, PC/ABS, PEEK, HDPE, TPU, PET, PPO,...etc. |
Mould base | Standard mould base,HASCO,FUTABA,DME,LKM |
Surface treatment | Polish,texture,sandblasting,chrom |
Mould life | 250000-300000shots |
Delivery time | Sample making 7-10 days,mold making 15-40 days |
Pacakge | Standard export wooden case |
Specification | Depends on customer's requirements. |
Mould precision | +/-0.03mm |
Mould size | According to your 2D, 3D Drawing |
Plastic Industrial Mould and Parts Show:
Quality Control Process:
Plastic Industrial Mould Factory Information:
Certification:
Product Showcase:
FAQ:
Q: Can you make the production mold with short run production?
A: Yes, we can make the production for any quality your require.
Q: Are the samples free of charge?
A: Yes, the first trial samples(5-10pcs) is free, and we will send you the sample by DHL, FEDEX or TNT as soon as we finish.
Q: I don’t have 3D drawing, can I make a mold?
A: If you can supply us a sample, we will help you finish the 3D drawing design.
Q: How long is the lead-time for mold?
A: It depends on the size and complexity of the mold. Normally, the lead time is 25 to 35days. But if the mold is simple and small, we can work out in 15 days.
Q: Is it possible to know how's product going on without visiting your company?
A: We will offer the schedule of mold making thought pictures and videos.
Q: How to make sure the quality before shipment?
A: We will supply the samples for your test.